Electrical Cables
0.61kV 5-Core Low Voltage Power Cable Factory Wholesale
-
Clear shipment tracking
-
Rigorous quality inspection
-
Has good after-sales service
Detailed Description
Product Feature
1. Features 3P+N+PE three-phase five-wire structure, matching TN-S power distribution systems. The independent PE ground wire provides reliable grounding protection, prevents electric leakage, and greatly improves power consumption safety.
2. Adopts high-purity copper conductors with stable electrical performance and low voltage drop. It effectively reduces power transmission loss and maintains long-term stable and efficient power supply.
3. Built with high-strength flame-retardant insulation and sheath. It has excellent aging resistance, compression resistance, corrosion resistance and anti-interference ability, suitable for various complex laying environments.
4. Rated 0.6/1kV low voltage, suitable for buildings, industrial equipment, elevators, new energy and municipal engineering. It fully meets the demands of high-standard safe power distribution projects.
5. Supports fixed installation in cable trays, conduits and trenches. Armored models support direct burial, with strong environmental adaptability and simple, efficient construction.






Technical Specifications of 5 Core Low Voltage Power Cable
| Item | Specification |
|---|---|
| Rated Voltage | 0.6/1kV Low Voltage |
| Core Structure | 5-core three-phase five-wire (3P + N + PE) |
| Applicable System | TN-S three-phase five-wire safety power distribution system |
| Conductor Material | High-purity copper conductor |
| Installation Method | Fixed laying in cable trays, conduits and cable trenches (armored type for direct burial) |
Why Choose Yiyue
We supply a full range of cables made of high-purity conductors and premium insulation materials, manufactured to national standards and certified with official approvals. Featuring flame retardancy, aging resistance and stable conductivity, our cables ensure safe and durable power transmission with accurate length. Suitable for construction, industry, municipal and new energy projects, we also support custom specifications. As a direct manufacturer, we offer competitive pricing, fast delivery and reliable after-sales service, providing trusted wiring solutions for various power distribution projects.



Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method Region Estimated Transit Time Remarks Sea Freight Southeast Asia 15–25 working days Port to port, FCL & LCL available Middle East 15–25 working days Port to port, FCL & LCL available North America 20–30 working days Port to port, FCL & LCL available Europe 25–35 working days Port to port, FCL & LCL available Oceania 20–30 working days Port to port, FCL & LCL available Africa 30–45 working days Port to port, FCL & LCL available Air Freight Southeast Asia 5–7 working days Airport to airport, for urgent orders Middle East 5–7 working days Airport to airport, for urgent orders North America 10–15 working days Airport to airport, for urgent orders Europe 7–15 working days Airport to airport, for urgent orders Africa 4–6 working days Airport to airport, for urgent orders Air Freight (Express) Worldwide Major Countries 3–7 working days Door-to-door, suitable for small spare parts
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
| Shipping Method | Region | Estimated Transit Time | Remarks |
| Sea Freight | Southeast Asia | 15–25 working days | Port to port, FCL & LCL available |
| Middle East | 15–25 working days | Port to port, FCL & LCL available | |
| North America | 20–30 working days | Port to port, FCL & LCL available | |
| Europe | 25–35 working days | Port to port, FCL & LCL available | |
| Oceania | 20–30 working days | Port to port, FCL & LCL available | |
| Africa | 30–45 working days | Port to port, FCL & LCL available | |
| Air Freight | Southeast Asia | 5–7 working days | Airport to airport, for urgent orders |
| Middle East | 5–7 working days | Airport to airport, for urgent orders | |
| North America | 10–15 working days | Airport to airport, for urgent orders | |
| Europe | 7–15 working days | Airport to airport, for urgent orders | |
| Africa | 4–6 working days | Airport to airport, for urgent orders | |
| Air Freight (Express) | Worldwide Major Countries | 3–7 working days | Door-to-door, suitable for small spare parts |