Gasoline Generator Set
3KW Open Type Gasoline Generator 4-Stroke Air Cooled Portable Petrol Generator With AVR Stabilizer
-
Clear shipment tracking
-
Rigorous quality inspection
-
Has good after-sales service
Detailed Description
Product Feature
✅ Equipped with 4-stroke OHV air-cooled gasoline engine, low fuel consumption and stable performance
✅ 100% pure copper alternator built-in AVR, output stable voltage to protect electrical appliances
✅ Robust open steel frame, excellent heat dissipation, easy inspection and maintenance
✅ Multiple safety protection: low oil shutdown, overload & short circuit protection
✅ Multiple AC & DC output sockets to power various devices
✅ Support OEM customization, comply with CE & ISO standards






Technical Specifications of 3kw Gasoline Generator Set
| Item | Specification |
|---|---|
| Product Type | Open Frame Portable Gasoline Generator |
| Rated Power | 3000W / 3KW |
| Max Power | 3300W / 3.3KW |
| Output Voltage | Single Phase 230V (110V Optional) |
| Frequency | 50Hz / 60Hz Optional |
| Power Factor | 1.0 |
| Alternator | 100% Pure Copper Wire with AVR Stabilizer |
| Engine Type | Single Cylinder, 4-Stroke, OHV, Air-Cooled |
| Displacement | 212cc |
| Starting System | Recoil Start / Electric Start Optional |
| Fuel Type | Unleaded Gasoline |
| Fuel Tank Capacity | 15L |
| Continuous Running Time | 8~10 Hours (50% Load) |
| Oil Capacity | 0.6L |
| Noise Level | ≤72dB @ 7m Distance |
| Protection System | Low Oil Shutdown, Overload Protection, Short Circuit Protection |
| Frame Structure | Heavy Duty Open Steel Frame |
| Optional Accessories | Moving Wheels, Handle, Battery |
| Net Weight / Gross Weight | 42kg / 45kg |
| Dimension (L×W×H) | 600×450×480mm |
| Certificate | CE, ISO9001 |
| Application | Home Backup, Camping, Construction Site, Outdoor Temporary Power |
Why Choose Yiyue
1.Experienced Generator Manufacturer
We specialize in portable power equipment. Every unit passes running test, voltage inspection and safety test before delivery to guarantee consistent quality.
2.Flexible Customization Service
Support different voltage, frequency, printing logo, outer color and accessory configuration to satisfy various market demands.

3.Strict Production Quality Control
Complete assembly production lines, standardized production procedures, stable quality for bulk wholesale orders.
4..Reasonable Lead Time
Arrange production plan scientifically to ensure on-time shipment for container orders.
5.Professional Technical Support
Our sales & engineering team provide parameter consultation, operation manual and remote after-sales guidance.

Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method Region Estimated Transit Time Remarks Sea Freight Southeast Asia 15–25 working days Port to port, FCL & LCL available Middle East 15–25 working days Port to port, FCL & LCL available North America 20–30 working days Port to port, FCL & LCL available Europe 25–35 working days Port to port, FCL & LCL available Oceania 20–30 working days Port to port, FCL & LCL available Africa 30–45 working days Port to port, FCL & LCL available Air Freight Southeast Asia 5–7 working days Airport to airport, for urgent orders Middle East 5–7 working days Airport to airport, for urgent orders North America 10–15 working days Airport to airport, for urgent orders Europe 7–15 working days Airport to airport, for urgent orders Africa 4–6 working days Airport to airport, for urgent orders Air Freight (Express) Worldwide Major Countries 3–7 working days Door-to-door, suitable for small spare parts
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
| Shipping Method | Region | Estimated Transit Time | Remarks |
| Sea Freight | Southeast Asia | 15–25 working days | Port to port, FCL & LCL available |
| Middle East | 15–25 working days | Port to port, FCL & LCL available | |
| North America | 20–30 working days | Port to port, FCL & LCL available | |
| Europe | 25–35 working days | Port to port, FCL & LCL available | |
| Oceania | 20–30 working days | Port to port, FCL & LCL available | |
| Africa | 30–45 working days | Port to port, FCL & LCL available | |
| Air Freight | Southeast Asia | 5–7 working days | Airport to airport, for urgent orders |
| Middle East | 5–7 working days | Airport to airport, for urgent orders | |
| North America | 10–15 working days | Airport to airport, for urgent orders | |
| Europe | 7–15 working days | Airport to airport, for urgent orders | |
| Africa | 4–6 working days | Airport to airport, for urgent orders | |
| Air Freight (Express) | Worldwide Major Countries | 3–7 working days | Door-to-door, suitable for small spare parts |