EN
Current Language
    Change Language
    HomeProductsPower Transformers630kVA High-Efficiency Three-Phase Dry Type Power Transformer
    • 630kVA High-Efficiency Three-Phase Dry Type Power Transformer
    • 630kVA High-Efficiency Three-Phase Dry Type Power Transformer
    • 630kVA High-Efficiency Three-Phase Dry Type Power Transformer
    • 630kVA High-Efficiency Three-Phase Dry Type Power Transformer
    Dry Type Transformers

    630kVA High-Efficiency Three-Phase Dry Type Power Transformer

    This 630kVA high-efficiency three-phase dry type power transformer is an air-cooled fully enclosed epoxy-cast electrical transformation device with Dyn11 connection group for 10kV to 0.4kV voltage conversion, which solves unstable grid voltage, high energy loss and fire hazard risks in photovoltaic stations, industrial parks and residential box substations, and boasts ultra-low no-load & load loss, flame-retardant insulation, low noise, maintenance-free operation and strong overload resistance.

    • Clear shipment tracking

    • Rigorous quality inspection

    • Has good after-sales service

    Share:

    Detailed Description

    Production Feature

    1.High-efficiency design with ultra-low no-load & load loss to cut long-term electricity costs.
    2.Epoxy resin cast structure, flame retardant and explosion-proof for safe indoor use.
    3.Maintenance-free sealed construction, saving labor and regular upkeep expenses.
    4.Strong short-circuit resistance, low noise and stable full-load continuous operation.
    5.Compliant with IEC standards, ideal for factories, residential blocks and commercial buildings.

    Specifications of 630kVA High-Efficiency Three-Phase Dry Type Power Transformer

    ParameterValue
    Rated Capacity630kVA
    Phase & Frequency3-phase, 50Hz
    Primary / Secondary Rated Voltage10kV / 0.4kV
    Connection GroupDyn11
    Short-circuit Impedance4%
    Voltage RegulationOff-circuit tap changer, ±2×2.5%
    Cooling MethodAN/AF (Air Natural / Air Forced)

    Why Choose Yiyue

    • 1. Large modern factory base in Hefei, Anhui, automated production lines and annual output exceeding 30,000 units, supporting fast bulk order delivery and full OEM & ODM customization.
    • 2. Fully certified with IEC 60076, ISO 9001, CE and RoHS, all certificates available for overseas customs clearance and international project bidding.
    • 3. Strict 100% pre-delivery inspection, including insulation resistance test, transformer ratio test, load & no-load loss test and temperature rise test in strict accordance with IEC standards.
    • 4. Flexible customization on power, voltage, frequency and unit structure, offering private brand authorization and exclusive supply for cross-border e-commerce sellers.
    • 5. Complete global after-sales system with long-term core component warranty, remote technical support and sufficient spare parts inventory to minimize your operational risks.

    Packaging And Transportation

    Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.

    Customized Packaging Solutions

    • Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
    • Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
    • Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit

    All packages are marked with clear shipping marks and handling warnings for standard operation.

    Production Lead Time

    • Standard in-stock items: 5–7 working days upon payment confirmation
    • Customized non-standard products: 7–15 working days after design confirmation & deposit
    • Large orders with special requirements: Lead time subject to separate confirmation
    Shipping MethodRegionEstimated Transit TimeRemarks
    Sea FreightSoutheast Asia15–25 working daysPort to port, FCL & LCL available
    Middle East15–25 working daysPort to port, FCL & LCL available
    North America20–30 working daysPort to port, FCL & LCL available
    Europe25–35 working daysPort to port, FCL & LCL available
    Oceania20–30 working daysPort to port, FCL & LCL available
    Africa30–45 working daysPort to port, FCL & LCL available
    Air FreightSoutheast Asia5–7 working daysAirport to airport, for urgent orders
    Middle East5–7 working daysAirport to airport, for urgent orders
    North America10–15 working daysAirport to airport, for urgent orders
    Europe7–15 working daysAirport to airport, for urgent orders
    Africa4–6 working daysAirport to airport, for urgent orders
    Air Freight (Express)Worldwide Major Countries3–7 working daysDoor-to-door, suitable for small spare parts
    Applications
    FAQs
    • Is the S9 transformer suitable for new projects?

      The S9 series is mainly recommended for replacement projects or markets with moderate energy-efficiency requirements.
    • Can the transformer be customized?

      Yes. We support customization for voltage, capacity, dimensions, cooling methods, and special environmental adaptations. Our engineers will work with you to finalize the specs based on your project needs.
    • What standards do you follow?

      We design and test to IEC 60076 and GB/T standards. For specific markets, we can also produce to ANSI, BS, DIN, or AS standards. Third-party inspections are welcome.
    • What about the production?

      Production is done in our 8,000㎡ Hefei plant. Standard lead time is 20–35 working days, with expedited options available. Factory acceptance testing is welcome before shipment.
    WhatsApp

    Leave a message!

    Leave a message!