A professional electrical engineering team offers a comprehensive and customizable one-stop service covering all categories.
High Voltage Switchgear Panels
Compact 24kV Gas Insulated RMU Modular SF6 Inflatable Cabinet Indoor Distribution Switchgear
-
Clear shipment tracking
-
Rigorous quality inspection
-
Has good after-sales service
Detailed Description
Product Feature
✅ Fully welded stainless steel gas tank, primary components reach IP67 protection level
✅ SF6 gas used for insulation and arc extinction, stable dielectric performance
✅ Compact modular structure, flexible combination for different switching schemes
✅ Complete mechanical interlock device to avoid dangerous misoperation
✅ Indoor outer cabinet with IP4X protection for operator safety
✅ Support configuration of load break switch or vacuum circuit breaker(VCB)
✅ Designed and tested in accordance with IEC 62271 standards, OEM customization supported






Technical Specifications of 24kV Gas Inflatable Cabinet
| Item | Specification |
|---|---|
| Rated Voltage | 24kV |
| Rated Frequency | 50Hz |
| Rated Current | 630A / 1250A Optional |
| Rated Short-time Withstand Current | 20kA / 25kA (3s) |
| Gas Compartment Protection | IP67 |
| Outer Cabinet Protection | IP4X |
| Switch Type | 3-position Load Break Switch / VCB Optional |
| Insulating & Arc Extinguishing Medium | SF6 Gas |
| Installation Condition | Indoor |
| Working Altitude | ≤1000m (high altitude customized available) |
| Ambient Temperature | -25℃ ~ +40℃ |
| Executive Standard | IEC 62271 |
Why Choose Yiyue
1.Professional medium voltage switchgear manufacturer with complete type test report.
2.Flexible scheme configuration for ring main, incoming, feeder and transformer protection.
3.Strict air tightness inspection for each gas tank before delivery.
4.Stable production cycle for bulk projects and container orders.
5.Provide single line drawing, dimension drawing, wiring diagram and operation manual.
6.Customized cabinet size, color, secondary control scheme and brand logo.

Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method Region Estimated Transit Time Remarks Sea Freight Southeast Asia 15–25 working days Port to port, FCL & LCL available Middle East 15–25 working days Port to port, FCL & LCL available North America 20–30 working days Port to port, FCL & LCL available Europe 25–35 working days Port to port, FCL & LCL available Oceania 20–30 working days Port to port, FCL & LCL available Africa 30–45 working days Port to port, FCL & LCL available Air Freight Southeast Asia 5–7 working days Airport to airport, for urgent orders Middle East 5–7 working days Airport to airport, for urgent orders North America 10–15 working days Airport to airport, for urgent orders Europe 7–15 working days Airport to airport, for urgent orders Africa 4–6 working days Airport to airport, for urgent orders Air Freight (Express) Worldwide Major Countries 3–7 working days Door-to-door, suitable for small spare parts
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
| Shipping Method | Region | Estimated Transit Time | Remarks |
| Sea Freight | Southeast Asia | 15–25 working days | Port to port, FCL & LCL available |
| Middle East | 15–25 working days | Port to port, FCL & LCL available | |
| North America | 20–30 working days | Port to port, FCL & LCL available | |
| Europe | 25–35 working days | Port to port, FCL & LCL available | |
| Oceania | 20–30 working days | Port to port, FCL & LCL available | |
| Africa | 30–45 working days | Port to port, FCL & LCL available | |
| Air Freight | Southeast Asia | 5–7 working days | Airport to airport, for urgent orders |
| Middle East | 5–7 working days | Airport to airport, for urgent orders | |
| North America | 10–15 working days | Airport to airport, for urgent orders | |
| Europe | 7–15 working days | Airport to airport, for urgent orders | |
| Africa | 4–6 working days | Airport to airport, for urgent orders | |
| Air Freight (Express) | Worldwide Major Countries | 3–7 working days | Door-to-door, suitable for small spare parts |