Support OEM & ODM Customization
Electrical Cables
Low Voltage 4 Core Aluminum Power Cable YJLV 0.6/1kV XLPE PVC Sheath 4‑Core Aluminium Electrical Cable for Industrial Power Transmission
-
Clear shipment tracking
-
Rigorous quality inspection
-
Has good after-sales service
Detailed Description
Product Feature
✅High‑purity aluminum conductor, excellent electrical conductivity, lightweight for easy handling & installation.
✅XLPE cross‑linked polyethylene insulation, high heat resistance, stable electrical performance
✅PVC outer sheath, anti‑aging, good resistance to corrosion and environmental damage
✅Suitable for duct, overhead and indoor laying, not for direct underground burial
✅Low comprehensive cost, cost‑effective for industrial & building power distribution projects
✅Strictly manufactured to international industry standards, stable long‑term operation
✅Widely used in municipal engineering, factory power supply, residential area power distribution






Technical Specifications of 4 Core Low Voltage Aluminum Power Cable
| 标称截面 (mm²) | 绝缘厚度 (mm) | 护套厚度 (mm) | 近似外径 (mm) | 近似重量 (kg/km) | 20℃导体最大直流电阻 (Ω/km) | 空气中载流量 (A) | 直埋土壤载流量 (A) |
|---|---|---|---|---|---|---|---|
| 4×2.5 | 0.7 | 1.8 | 12.1 | 132 | 12.10 | 26 | 20 |
| 4×4 | 0.7 | 1.8 | 13.2 | 162 | 7.41 | 34 | 27 |
| 4×6 | 0.7 | 1.8 | 14.5 | 202 | 4.61 | 43 | 35 |
| 4×10 | 0.7 | 1.8 | 17.8 | 331 | 3.08 | 57 | 66 |
| 4×16 | 0.7 | 1.8 | 20.5 | 434 | 1.91 | 74 | 85 |
| 4×25 | 0.9 | 1.8 | 23.9 | 602 | 1.20 | 99 | 110 |
| 4×35 | 0.9 | 1.8 | 26.3 | 751 | 0.868 | 119 | 130 |
| 4×50 | 1.0 | 1.8 | 30.1 | 917 | 0.641 | 148 | 160 |
| 4×70 | 1.1 | 1.9 | 34.4 | 1322 | 0.443 | 188 | 195 |
| 4×95 | 1.1 | 2.0 | 38.8 | 1780 | 0.320 | 233 | 235 |
| 4×120 | 1.2 | 2.1 | 42.9 | 2147 | 0.253 | 273 | 265 |
| 4×150 | 1.4 | 2.3 | 47.9 | 2674 | 0.206 | 307 | 300 |
| 4×185 | 1.6 | 2.4 | 52.9 | 3308 | 0.164 | 359 | 340 |
| 4×240 | 1.7 | 2.6 | 59.3 | 4228 | 0.125 | 427 | 395 |
| 4×300 | 1.8 | 2.8 | 65.5 | 5200 | 0.100 | 495 | 445 |
Why Choose Yiyue
One‑stop sourcing for full‑range electrical equipment: transformers, switchgears, box substations, EV chargers, generators, power cables and complete power distribution solutions.
Strong OEM & ODM customization: adapt to local voltage, frequency, IP rating, high‑temperature / salt‑fog harsh working conditions for global projects.
Strict factory‑level testing: every unit undergoes full inspection before delivery for stable performance in tough site environments.
Direct factory supply: competitive price without middle‑man markup, ideal for bulk project orders.
Professional foreign trade technical support: fast quotation, drawing support, certification documents, complete customs‑clearance papers and remote after‑sales guidance.
Rich overseas project experience: provide practical power distribution solutions for infrastructure, commercial‑industrial and new‑energy projects worldwide.



Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method Region Estimated Transit Time Remarks Sea Freight Southeast Asia 15–25 working days Port to port, FCL & LCL available Middle East 15–25 working days Port to port, FCL & LCL available North America 20–30 working days Port to port, FCL & LCL available Europe 25–35 working days Port to port, FCL & LCL available Oceania 20–30 working days Port to port, FCL & LCL available Africa 30–45 working days Port to port, FCL & LCL available Air Freight Southeast Asia 5–7 working days Airport to airport, for urgent orders Middle East 5–7 working days Airport to airport, for urgent orders North America 10–15 working days Airport to airport, for urgent orders Europe 7–15 working days Airport to airport, for urgent orders Africa 4–6 working days Airport to airport, for urgent orders Air Freight (Express) Worldwide Major Countries 3–7 working days Door-to-door, suitable for small spare parts
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
| Shipping Method | Region | Estimated Transit Time | Remarks |
| Sea Freight | Southeast Asia | 15–25 working days | Port to port, FCL & LCL available |
| Middle East | 15–25 working days | Port to port, FCL & LCL available | |
| North America | 20–30 working days | Port to port, FCL & LCL available | |
| Europe | 25–35 working days | Port to port, FCL & LCL available | |
| Oceania | 20–30 working days | Port to port, FCL & LCL available | |
| Africa | 30–45 working days | Port to port, FCL & LCL available | |
| Air Freight | Southeast Asia | 5–7 working days | Airport to airport, for urgent orders |
| Middle East | 5–7 working days | Airport to airport, for urgent orders | |
| North America | 10–15 working days | Airport to airport, for urgent orders | |
| Europe | 7–15 working days | Airport to airport, for urgent orders | |
| Africa | 4–6 working days | Airport to airport, for urgent orders | |
| Air Freight (Express) | Worldwide Major Countries | 3–7 working days | Door-to-door, suitable for small spare parts |