The PLC control cabinet is a special electrical enclosure for industrial automation systems, made of cold-rolled steel or stainless steel with solid structure and standard wiring. Equipped with PLC and auxiliary electrical components, it has overload, short-circuit and leakage protection, strong anti-interference ability and excellent protection grade. Customizable in size, layout and control schemes, it is widely used in production lines, water treatment, HVAC and municipal projects to realize automatic logic control and centralized monitoring, ensuring safe and stable long-term operation of automation systems.
Power Distribution Cabinets
Stable Custom PLC Control Cabinet from Reliable Manufacturer
-
Clear shipment tracking
-
Rigorous quality inspection
-
Has good after-sales service
Detailed Description
Product Feature
1.Adopts high-quality genuine PLC core components, ensuring stable signal processing and consistent automatic system operation.
2.Fully customizable layout, wiring scheme and control logic to match different industrial automation production line requirements.
3.Rigorous wiring process and standardized assembly, with good anti-interference performance for complex industrial electrical environments.
4.Complete protection functions including overload, short circuit and overheat protection, effectively extending service life and improving operational safety.
5.Clear wiring marking and humanized layout for convenient inspection, debugging and daily maintenance work.
6.Strict factory testing and compliance with industry electrical standards, supplied directly by professional manufacturers with reliable quality control.






Technical Specifications of Stable Custom PLC Control Cabinet
| Parameter | Specification |
|---|---|
| Rated Operating Voltage | AC 220V / 380V |
| Protection Class | IP54 (IP30/IP65 optional) |
| Ambient Operating Temperature | -10℃ ~ +40℃ |
| Cabinet Material | Cold Rolled Steel / Stainless Steel |
| Compatible PLC Brands | Siemens / Mitsubishi / Omron and other mainstream brands |
Why Choose Yiyue
All electrical products pass strict factory tests in line with IEC, CE and ANSI standards, with outstanding anti-corrosion and sealing performance for outdoor application.
Hefei Yiyue Electrical Equipment Trading Co., Ltd focuses deeply on the core sectors of the electrical equipment industry.
Based in Hefei, the company serves the domestic market while expanding its reach nationwide and globally.
Driven by the mission to “connect the world’s advanced electrical technologies and build an intelligent, efficient energy ecosystem”.
It strives to become a top-tier domestic and internationally renowned provider of electrical equipment trading and comprehensive services.
The company owns an independent industrial park covering 8,000 square meters.
Main products: generator sets, transformers, box-type substations, high and low voltage switchgear, power distribution cabinets, gas-insulated ring main units (RMUs), vacuum circuit breakers, power system accessories, power cables.



Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method Region Estimated Transit Time Remarks Sea Freight Southeast Asia 15–25 working days Port to port, FCL & LCL available Middle East 15–25 working days Port to port, FCL & LCL available North America 20–30 working days Port to port, FCL & LCL available Europe 25–35 working days Port to port, FCL & LCL available Oceania 20–30 working days Port to port, FCL & LCL available Africa 30–45 working days Port to port, FCL & LCL available Air Freight Southeast Asia 5–7 working days Airport to airport, for urgent orders Middle East 5–7 working days Airport to airport, for urgent orders North America 10–15 working days Airport to airport, for urgent orders Europe 7–15 working days Airport to airport, for urgent orders Africa 4–6 working days Airport to airport, for urgent orders Air Freight (Express) Worldwide Major Countries 3–7 working days Door-to-door, suitable for small spare parts
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
| Shipping Method | Region | Estimated Transit Time | Remarks |
| Sea Freight | Southeast Asia | 15–25 working days | Port to port, FCL & LCL available |
| Middle East | 15–25 working days | Port to port, FCL & LCL available | |
| North America | 20–30 working days | Port to port, FCL & LCL available | |
| Europe | 25–35 working days | Port to port, FCL & LCL available | |
| Oceania | 20–30 working days | Port to port, FCL & LCL available | |
| Africa | 30–45 working days | Port to port, FCL & LCL available | |
| Air Freight | Southeast Asia | 5–7 working days | Airport to airport, for urgent orders |
| Middle East | 5–7 working days | Airport to airport, for urgent orders | |
| North America | 10–15 working days | Airport to airport, for urgent orders | |
| Europe | 7–15 working days | Airport to airport, for urgent orders | |
| Africa | 4–6 working days | Airport to airport, for urgent orders | |
| Air Freight (Express) | Worldwide Major Countries | 3–7 working days | Door-to-door, suitable for small spare parts |