Diesel Generator Set
20kW Silent Diesel Generator 25kVA Three Phase ATS Backup Power Genset for Commercial Industrial Use
-
Clear shipment tracking
-
Rigorous quality inspection
-
Has good after-sales service
Detailed Description
Product Feature
1.Built-in water-cooled diesel engine, stable continuous output of 20kW, reliable for long-hour operation
2.Pure copper alternator, low voltage distortion, protects sensitive electrical equipment from surge damage
3.Soundproof canopy design greatly reduces operating noise, suitable for residential, farm and commercial areas
4.FLow fuel consumption system with large fuel tank, supports extended runtime without frequent refueling
5.Three-phase 400V output, flexible for industrial equipment, construction machinery and off-grid power supply






Technical Specifications of 20kW Diesel Generator
| Item | Parameter |
|---|---|
| Rated Power | 20kW (25kVA) |
| Standby Power | 22kW (27.5kVA) |
| Phase | 3 Phase 4 Wire |
| Rated Voltage | 400V/230V |
| Rated Frequency | 50Hz / 60Hz (Optional) |
| Power Factor | 0.8 Lagging |
| Engine Type | Water-cooled, 4-stroke, Direct Injection Diesel Engine |
| Governor | Mechanical / Electronic Governor (Optional) |
| Alternator | Pure Copper Brushless Alternator |
| Excitation Type | Self-excited |
| Voltage Regulation | ±1% |
| Control Panel | Digital Controller, Display: Voltage, Frequency, Current, Hour Meter, Fault Alarm |
| ATS | Optional Automatic Transfer Switch |
| Noise Level | 68–72dB @7m (Silent Canopy Type); 85–90dB @7m (Open Type) |
| Fuel Tank Capacity | 50L |
| Fuel Consumption (75% Load) | 5.2 L/H |
| Starting Method | Electric Start, Remote Start Optional |
| Protection | Low Oil Pressure, High Temperature, Overload, Overvoltage, Short Circuit Protection |
| Cooling Method | Water Cooling |
| Color | Customizable |
| Optional Structure | Open Type / Silent Canopy / Mobile Trailer |
| Certification | CE, ISO |
| Application | Industrial Backup, Construction, Farm, Warehouse, Off-grid Power Supply |
Why Choose Yiyue
Yiyue focuses on high-performance diesel generator sets. Our 20kW genset undergoes rigorous testing to guarantee stable power output under heavy load. We offer abundant configurable options and accept OEM customization. With reliable quality, reasonable fuel consumption and complete safety protection, Yiyue generators are widely used as backup or prime power for factories, construction sites, farms and warehouses. We provide dependable technical support and efficient after-sales service to help global buyers solve power supply problems.



Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method Region Estimated Transit Time Remarks Sea Freight Southeast Asia 15–25 working days Port to port, FCL & LCL available Middle East 15–25 working days Port to port, FCL & LCL available North America 20–30 working days Port to port, FCL & LCL available Europe 25–35 working days Port to port, FCL & LCL available Oceania 20–30 working days Port to port, FCL & LCL available Africa 30–45 working days Port to port, FCL & LCL available Air Freight Southeast Asia 5–7 working days Airport to airport, for urgent orders Middle East 5–7 working days Airport to airport, for urgent orders North America 10–15 working days Airport to airport, for urgent orders Europe 7–15 working days Airport to airport, for urgent orders Africa 4–6 working days Airport to airport, for urgent orders Air Freight (Express) Worldwide Major Countries 3–7 working days Door-to-door, suitable for small spare parts
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
| Shipping Method | Region | Estimated Transit Time | Remarks |
| Sea Freight | Southeast Asia | 15–25 working days | Port to port, FCL & LCL available |
| Middle East | 15–25 working days | Port to port, FCL & LCL available | |
| North America | 20–30 working days | Port to port, FCL & LCL available | |
| Europe | 25–35 working days | Port to port, FCL & LCL available | |
| Oceania | 20–30 working days | Port to port, FCL & LCL available | |
| Africa | 30–45 working days | Port to port, FCL & LCL available | |
| Air Freight | Southeast Asia | 5–7 working days | Airport to airport, for urgent orders |
| Middle East | 5–7 working days | Airport to airport, for urgent orders | |
| North America | 10–15 working days | Airport to airport, for urgent orders | |
| Europe | 7–15 working days | Airport to airport, for urgent orders | |
| Africa | 4–6 working days | Airport to airport, for urgent orders | |
| Air Freight (Express) | Worldwide Major Countries | 3–7 working days | Door-to-door, suitable for small spare parts |