EN
Current Language
    Change Language
    HomeProducts3000kW High Efficiency Open Frame Diesel Generator for Factory Emergency Power
    • 3000kW High Efficiency Open Frame Diesel Generator for Factory Emergency Power
    • 3000kW High Efficiency Open Frame Diesel Generator for Factory Emergency Power
    Diesel Generator Set

    3000kW High Efficiency Open Frame Diesel Generator for Factory Emergency Power

    This 3000kW high-efficiency open frame diesel generator serves as heavy-duty emergency backup power for large factories and industrial parks. Adopting open-frame structure, it delivers superior heat dissipation and full access for quick maintenance. Equipped with premium V-type 16-cylinder turbocharged diesel engine, it provides stable 400/230V three-phase output, supporting continuous full-load operation and short-time standby overload. It meets global grid standards with optional 50/60Hz frequency, passed  certification, and is widely applied for manufacturing plants, data centers and large-scale industrial power backup.
     
    • Customization: Available
    • Capacity: Power, Electronic, Instrument, Lighting, Rectifier, Audio
    • Clear shipment tracking

    • Rigorous quality inspection

    • Has good after-sales service

    Share:

    Detailed Description

    Product Feature

    1.3000kW stable three-phase output, perfect for factory emergency backup power.

    2.High-efficiency diesel engine design, low fuel consumption to cut operation cost.

    3.Open frame structure with strong heat dissipation, continuous full-load operation.

    4.Intelligent control panel for real-time monitoring and automatic protection.

    5.Durable base with shock absorbers, long service life for construction & industrial sites.

    Specifications of 3000kW High Efficiency Open Frame Diesel Generator for Factory Emergency Power

    ItemParameter
    Prime Power2700 kW
    Standby Power3000 kW
    Rated Capacity3750 kVA
    Output Voltage400/230V (3-phase 4-wire)
    Rated Current~5400 A
    Frequency / Rotational Speed50Hz / 1500 rpm

    Why Choose Yiyue

    • Large modern factory base in Hefei, Anhui , automated production lines and annual output exceeding 30,000 units, supporting fast bulk order delivery and full OEM & ODM customization.
    • Fully certified with IEC 60076, ISO 9001, CE and RoHS, all certificates available for overseas customs clearance and international project bidding.
    • Strict 100% pre-delivery inspection, including insulation resistance test, transformer ratio test, load & no-load loss test and temperature rise test in strict accordance with IEC standards.
    • Flexible customization on power, voltage, frequency and unit structure, offering private brand authorization and exclusive supply for cross-border e-commerce sellers.
    • Complete global after-sales system with long-term core component warranty, remote technical support and sufficient spare parts inventory to minimize your operational risks

    Packaging And Transportation

    Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.

    Customized Packaging Solutions

    • Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
    • Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
    • Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit

    All packages are marked with clear shipping marks and handling warnings for standard operation.

    Production Lead Time

    • Standard in-stock items: 5–7 working days upon payment confirmation
    • Customized non-standard products: 7–15 working days after design confirmation & deposit
    • Large orders with special requirements: Lead time subject to separate confirmation
    Shipping MethodRegionEstimated Transit TimeRemarks
    Sea FreightSoutheast Asia15–25 working daysPort to port, FCL & LCL available
    Middle East15–25 working daysPort to port, FCL & LCL available
    North America20–30 working daysPort to port, FCL & LCL available
    Europe25–35 working daysPort to port, FCL & LCL available
    Oceania20–30 working daysPort to port, FCL & LCL available
    Africa30–45 working daysPort to port, FCL & LCL available
    Air FreightSoutheast Asia5–7 working daysAirport to airport, for urgent orders
    Middle East5–7 working daysAirport to airport, for urgent orders
    North America10–15 working daysAirport to airport, for urgent orders
    Europe7–15 working daysAirport to airport, for urgent orders
    Africa4–6 working daysAirport to airport, for urgent orders
    Air Freight (Express)Worldwide Major Countries3–7 working daysDoor-to-door, suitable for small spare parts
    Applications
    FAQs
    WhatsApp

    Leave a message!

    Leave a message!