Our 50kW / 62.5kVA diesel generator set is a reliable prime & standby power solution built to ISO8528 and CE standards. Available in open type and silent type, this genset can be equipped with Weichai, Yuchai, Cummins or customized brand diesel engines, matched with brushless pure copper alternator. It supports 50Hz / 60Hz, single phase & three phase voltage options, delivering stable continuous power for commercial backup, construction sites, remote areas, hospitals, shopping malls and industrial workshops. With optional ATS automatic transfer switch, it realizes unattended automatic startup once mains power fails.
Diesel Generator Set
50kW Silent Water Cooled Diesel Generator Set
-
Clear shipment tracking
-
Rigorous quality inspection
-
Has good after-sales service
Detailed Description
Product Feature
1.Turbocharged water-cooled diesel engine, low fuel consumption & durable performance
2.Compact weatherproof canopy design, suitable for urban, residential and downtown areas
3.Strict full-load running test before shipment, comply with ISO8528 & CE standards
4.Protections: low oil pressure, high coolant temperature, overload, overspeed, over/under voltage
5.Less maintenance, wide application for commercial backup, construction and remote areas






Technical Specifications of 50kw Diesel Generator Set
| Item | Standard Parameter | Optional Customization |
|---|---|---|
| Prime Power | 50kW / 62.5kVA | / |
| Standby Power | 55kW / 68.75kVA | / |
| Frequency | 50Hz | 60Hz for North America market |
| Rated Voltage | 400/230V Three Phase | 120/240V, 480V, Single Phase |
| Power Factor | 0.8 Lagging | / |
| Rotation Speed | 1500rpm(50Hz) / 1800rpm(60Hz) | / |
| Cooling System | Water Cooling | / |
| Starting System | 24V Electric Start | / |
| Alternator | Brushless, 100% Copper Winding | / |
| Control System | SmartGen Digital Controller | Deepsea controller upgrade |
| Structure Type | Open Type | Silent Soundproof Canopy / Mobile Trailer |
| Overload Capacity | 110% load for 1 hour every 12 hours | / |
| Compliance | ISO8528, CE, ISO9001 | EPA emission certificate optional |
Why Choose Yiyue
1.Professional genset manufacturer with abundant export experience worldwide
2. Multiple engine brands optional: Weichai, Yuchai, Cummins etc.
3.Support OEM customization: canopy color, logo, control configuration, remote monitoring
4.Complete test reports and certification documents for project bidding
5.Rigorous no-load, half-load and full-load inspection before delivery
6.Professional technical team provides scheme consultation and installation guidance
Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method Region Estimated Transit Time Remarks Sea Freight Southeast Asia 15–25 working days Port to port, FCL & LCL available Middle East 15–25 working days Port to port, FCL & LCL available North America 20–30 working days Port to port, FCL & LCL available Europe 25–35 working days Port to port, FCL & LCL available Oceania 20–30 working days Port to port, FCL & LCL available Africa 30–45 working days Port to port, FCL & LCL available Air Freight Southeast Asia 5–7 working days Airport to airport, for urgent orders Middle East 5–7 working days Airport to airport, for urgent orders North America 10–15 working days Airport to airport, for urgent orders Europe 7–15 working days Airport to airport, for urgent orders Africa 4–6 working days Airport to airport, for urgent orders Air Freight (Express) Worldwide Major Countries 3–7 working days Door-to-door, suitable for small spare parts
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
| Shipping Method | Region | Estimated Transit Time | Remarks |
| Sea Freight | Southeast Asia | 15–25 working days | Port to port, FCL & LCL available |
| Middle East | 15–25 working days | Port to port, FCL & LCL available | |
| North America | 20–30 working days | Port to port, FCL & LCL available | |
| Europe | 25–35 working days | Port to port, FCL & LCL available | |
| Oceania | 20–30 working days | Port to port, FCL & LCL available | |
| Africa | 30–45 working days | Port to port, FCL & LCL available | |
| Air Freight | Southeast Asia | 5–7 working days | Airport to airport, for urgent orders |
| Middle East | 5–7 working days | Airport to airport, for urgent orders | |
| North America | 10–15 working days | Airport to airport, for urgent orders | |
| Europe | 7–15 working days | Airport to airport, for urgent orders | |
| Africa | 4–6 working days | Airport to airport, for urgent orders | |
| Air Freight (Express) | Worldwide Major Countries | 3–7 working days | Door-to-door, suitable for small spare parts |