Diesel Generator Set
8.5kW Portable Diesel Power Generator, Auto Start ATS Compatible, 50Hz 60Hz Selectable, Single Phase / Three Phase Available
-
Clear shipment tracking
-
Rigorous quality inspection
-
Has good after-sales service
Detailed Description
Product Feature
1.8.5kW rated output power, heavy-duty design for continuous stable power output.
2.Single cylinder 4-stroke air-cooled diesel engine, strong power and easy maintenance.
3.Built-in multi-protection: low oil pressure shutdown, overload, overcurrent and overheat protection.
4.Silent canopy and open frame two versions for different noise requirement scenarios.
5.Optional single phase or three phase, 50Hz / 60Hz adjustable for global markets.






Technical Specifications of 8.5kW Open Frame Diesel Generator
| Item | Parameter |
|---|---|
| Rated Power | 8.5kW |
| Max Power | 9.0kW |
| Phase | Single Phase / Three Phase Optional |
| Frequency | 50Hz / 60Hz Optional |
| Rated Voltage | 220V / 230V / 380V / 400V Optional |
| Engine Type | Single Cylinder, 4-Stroke, Air-Cooled Diesel Engine |
| Displacement | 498cc |
| Starting System | Electric Start + Recoil Manual Start (Remote Start Optional) |
| Fuel Type | Diesel |
| Fuel Tank Capacity | 20L |
| Fuel Consumption | 275g/kW·h |
| Continuous Running Time | Around 9h at 75% Load |
| Voltage Regulation | AVR Automatic Voltage Regulation |
| Alternator Type | Pure Copper Alternator |
| Waveform Distortion | < 3% |
| Noise Level | 75dB@7m (Open Frame) / 65dB@7m (Silent Canopy) |
| Protection | Low Oil Pressure Shutdown, Overload, Overcurrent, Overheat, Overvoltage |
| Frame Type | Open Frame / Silent Canopy Optional |
| Mobility | Heavy-Duty Wheels & Handrail |
| Dimension (L×W×H) | 780 × 560 × 600 mm (Open Type) |
| Net Weight | 158kg (Open Type) |
| Certifications | CE, Euro V Optional |
| Optional Accessory | ATS, Battery, Remote Start, Fuel Gauge |
| Custom Service | OEM, ODM, Logo, Color, Package Customized |
Why Choose Yiyue
Yiyue specializes in medium-power portable diesel generator sets for standby and mobile power scenarios. Our 8.5kW genset adopts well-matched single-cylinder air-cooled diesel engine and pure copper alternator, delivering clean sine wave power with low distortion.
We provide both open frame and silent canopy versions to fit villas, retail stores, construction sites and farms. Multiple optional configurations including remote start and ATS help customers realize automatic backup power. Each unit passes strict load testing before delivery. We supply professional operation and maintenance guidance, and support brand customization for global dealers, installers and power rental businesses.



Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method Region Estimated Transit Time Remarks Sea Freight Southeast Asia 15–25 working days Port to port, FCL & LCL available Middle East 15–25 working days Port to port, FCL & LCL available North America 20–30 working days Port to port, FCL & LCL available Europe 25–35 working days Port to port, FCL & LCL available Oceania 20–30 working days Port to port, FCL & LCL available Africa 30–45 working days Port to port, FCL & LCL available Air Freight Southeast Asia 5–7 working days Airport to airport, for urgent orders Middle East 5–7 working days Airport to airport, for urgent orders North America 10–15 working days Airport to airport, for urgent orders Europe 7–15 working days Airport to airport, for urgent orders Africa 4–6 working days Airport to airport, for urgent orders Air Freight (Express) Worldwide Major Countries 3–7 working days Door-to-door, suitable for small spare parts
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
| Shipping Method | Region | Estimated Transit Time | Remarks |
| Sea Freight | Southeast Asia | 15–25 working days | Port to port, FCL & LCL available |
| Middle East | 15–25 working days | Port to port, FCL & LCL available | |
| North America | 20–30 working days | Port to port, FCL & LCL available | |
| Europe | 25–35 working days | Port to port, FCL & LCL available | |
| Oceania | 20–30 working days | Port to port, FCL & LCL available | |
| Africa | 30–45 working days | Port to port, FCL & LCL available | |
| Air Freight | Southeast Asia | 5–7 working days | Airport to airport, for urgent orders |
| Middle East | 5–7 working days | Airport to airport, for urgent orders | |
| North America | 10–15 working days | Airport to airport, for urgent orders | |
| Europe | 7–15 working days | Airport to airport, for urgent orders | |
| Africa | 4–6 working days | Airport to airport, for urgent orders | |
| Air Freight (Express) | Worldwide Major Countries | 3–7 working days | Door-to-door, suitable for small spare parts |