Diesel Generator Set
6.5kW Air Cooled Diesel Genset, Low Noise Standby Power Generator, Mobile Wheel Kit, For Villa, Small Shop and Construction Site
-
Clear shipment tracking
-
Rigorous quality inspection
-
Has good after-sales service
Detailed Description
Product Feature
1.6.5kW rated output, balanced power capacity, ideal for mid-size backup and field power needs.
2.Single-cylinder 4-stroke air-cooled diesel engine, simple structure and easy routine maintenance.
3. AVR automatic voltage regulator paired with pure copper alternator, delivers stable sine wave power.
4. Two styles optional: open frame for construction, silent canopy for residential areas.
5.Support 50Hz / 60Hz and single-phase configuration to fit different regional grids.






Technical Specifications of 6.5kW Diesel Generator
| Item | Parameter |
|---|---|
| Rated Power | 6.5kW |
| Max Power | 7.0kW |
| Phase | Single Phase |
| Frequency | 50Hz / 60Hz Optional |
| Rated Voltage | 220V / 230V Optional |
| Engine Type | Single Cylinder, 4-Stroke, Air-Cooled Diesel Engine |
| Displacement | 456cc |
| Starting System | Electric Start + Recoil Manual Start |
| Fuel Type | Diesel |
| Fuel Tank Capacity | 18L |
| Fuel Consumption | 278g/kW·h |
| Continuous Running Time | Around 9.5h at 75% Load |
| Voltage Regulation | AVR Automatic Voltage Regulation |
| Alternator Type | Pure Copper Alternator |
| Waveform Distortion | <3% |
| Noise Level | 73dB@7m (Open Frame) / 63dB@7m (Silent Canopy) |
| Protection | Low Oil Pressure Shutdown, Overload, Overvoltage, Overheat Protection |
| Frame Type | Open Frame / Silent Canopy Optional |
| Mobility | Heavy-Duty Wheels & Handrail |
| Dimension (L×W×H) | 740 × 540 × 580 mm (Open Type) |
| Net Weight | 132kg (Open Type) |
| Certifications | CE, Euro V Optional |
| Optional Accessory | ATS, Battery, Remote Start |
| Custom Service | OEM, ODM, Logo, Color, Package Customized |
Why Choose Yiyue
Yiyue specializes in mid-power portable diesel generators for emergency backup and mobile power applications. Our 6.5kW diesel genset adopts a perfectly matched single-cylinder air-cooled diesel engine and pure copper alternator, delivering clean sine wave power with low distortion.
We provide both open frame and silent canopy options to satisfy different noise and usage scenarios. It is widely adopted for villas, retail stores, farms and light construction sites. Each generator passes strict load testing before shipment. We offer professional operation and maintenance guidance, and support customized branding for global dealers, installers and power rental partners.



Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method Region Estimated Transit Time Remarks Sea Freight Southeast Asia 15–25 working days Port to port, FCL & LCL available Middle East 15–25 working days Port to port, FCL & LCL available North America 20–30 working days Port to port, FCL & LCL available Europe 25–35 working days Port to port, FCL & LCL available Oceania 20–30 working days Port to port, FCL & LCL available Africa 30–45 working days Port to port, FCL & LCL available Air Freight Southeast Asia 5–7 working days Airport to airport, for urgent orders Middle East 5–7 working days Airport to airport, for urgent orders North America 10–15 working days Airport to airport, for urgent orders Europe 7–15 working days Airport to airport, for urgent orders Africa 4–6 working days Airport to airport, for urgent orders Air Freight (Express) Worldwide Major Countries 3–7 working days Door-to-door, suitable for small spare parts
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
| Shipping Method | Region | Estimated Transit Time | Remarks |
| Sea Freight | Southeast Asia | 15–25 working days | Port to port, FCL & LCL available |
| Middle East | 15–25 working days | Port to port, FCL & LCL available | |
| North America | 20–30 working days | Port to port, FCL & LCL available | |
| Europe | 25–35 working days | Port to port, FCL & LCL available | |
| Oceania | 20–30 working days | Port to port, FCL & LCL available | |
| Africa | 30–45 working days | Port to port, FCL & LCL available | |
| Air Freight | Southeast Asia | 5–7 working days | Airport to airport, for urgent orders |
| Middle East | 5–7 working days | Airport to airport, for urgent orders | |
| North America | 10–15 working days | Airport to airport, for urgent orders | |
| Europe | 7–15 working days | Airport to airport, for urgent orders | |
| Africa | 4–6 working days | Airport to airport, for urgent orders | |
| Air Freight (Express) | Worldwide Major Countries | 3–7 working days | Door-to-door, suitable for small spare parts |