This 100kVA single phase oil immersed distribution transformer is a standard pole-mounted / pad-mounted power conversion device engineered per ANSI C57.12 & IEC 60076 standards, widely used for overhead rural & suburban power grid, residential districts, small commercial buildings and agricultural power supply. Filled with mineral insulating oil for ONAN natural oil cooling, this 100 kVA single phase oil filled transformer converts high primary voltage (10kV/13.8kV/34.5kV) down to standard low secondary voltage 120/240V, 240/480V or customized ratings, delivering stable, low-loss single-phase power output for decentralized distribution systems.
Oil Immersed Transformers
Energy Efficient 100kVA Single Phase Oil Immersed Distribution Transformer
-
Clear shipment tracking
-
Rigorous quality inspection
-
Has good after-sales service
Detailed Description
Product Feature
1.Rated 100kVA single phase design, ideal for rural areas, residential scattered power supply
2.Support OEM logo, color, terminal layout and technical parameter adjustment
3.Weather-resistant anti-corrosion paint, adapt to coastal, high temperature & humid environment
4.Multiple voltage combinations customizable, support 50Hz / 60Hz, ANSI / IEC standard
5.Hermetically sealed fully welded tank, prevent moisture ingress, extend service life
6.High grain-oriented silicon steel core, low no-load loss, energy-saving operation






Technical Specifications of 100kva Single Phase Oil Immersed Transformer
| Item | Standard Parameter | Custom Optional |
|---|---|---|
| Rated Capacity | 100 kVA | / |
| Phase | Single Phase | / |
| Cooling Method | ONAN Mineral Oil Immersed Cooling | Forced oil cooling |
| Frequency | 60Hz (North America) | 50Hz |
| Primary Voltage | 13800V, 12470V, 34500V | 2.4kV ~ 34.5kV |
| Secondary Voltage | 120/240V Split Phase | 240/480V, 400V, 480V |
| Tap Changer | 3 Taps ±2.5% Off-Circuit Tap Changer | On-load tap changer |
| Winding Material | 100% Copper Wire | Aluminum winding |
| Core Material | Grain Oriented Silicon Steel Sheet | High permeability low-loss steel |
| Mount Type | Pole Mounted Cylindrical Tank | Pad Mounted Cabinet Type |
| Protection | Standard Pressure Relief Valve | CSP integrated protection (fuse, lightning arrester) |
| Standard Compliance | ANSI C57.12, IEC 60076 | UL, CE, ISO9001, CSA |
| Operating Temp Range | -40℃ ~ +125℃ | Tropical heat resistant version |
| Service Life | ≥20 Years | / |
Why Choose Yiyue
1.Specialized manufacturer of ANSI/IEC single phase distribution transformers, rich North America export experience
2.Flexible customization: voltage ratio, frequency, tank size, terminal type & OEM marking
3. Full performance inspection before shipment, complete test reports for utility tender
4. Adopt premium raw materials, stable quality and low operation failure rat
5. Products meet ANSI/IEEE C57.12 & IEC60076 international standards Professional engineering team support drawing confirmation and technical consultation
Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method Region Estimated Transit Time Remarks Sea Freight Southeast Asia 15–25 working days Port to port, FCL & LCL available Middle East 15–25 working days Port to port, FCL & LCL available North America 20–30 working days Port to port, FCL & LCL available Europe 25–35 working days Port to port, FCL & LCL available Oceania 20–30 working days Port to port, FCL & LCL available Africa 30–45 working days Port to port, FCL & LCL available Air Freight Southeast Asia 5–7 working days Airport to airport, for urgent orders Middle East 5–7 working days Airport to airport, for urgent orders North America 10–15 working days Airport to airport, for urgent orders Europe 7–15 working days Airport to airport, for urgent orders Africa 4–6 working days Airport to airport, for urgent orders Air Freight (Express) Worldwide Major Countries 3–7 working days Door-to-door, suitable for small spare parts
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
| Shipping Method | Region | Estimated Transit Time | Remarks |
| Sea Freight | Southeast Asia | 15–25 working days | Port to port, FCL & LCL available |
| Middle East | 15–25 working days | Port to port, FCL & LCL available | |
| North America | 20–30 working days | Port to port, FCL & LCL available | |
| Europe | 25–35 working days | Port to port, FCL & LCL available | |
| Oceania | 20–30 working days | Port to port, FCL & LCL available | |
| Africa | 30–45 working days | Port to port, FCL & LCL available | |
| Air Freight | Southeast Asia | 5–7 working days | Airport to airport, for urgent orders |
| Middle East | 5–7 working days | Airport to airport, for urgent orders | |
| North America | 10–15 working days | Airport to airport, for urgent orders | |
| Europe | 7–15 working days | Airport to airport, for urgent orders | |
| Africa | 4–6 working days | Airport to airport, for urgent orders | |
| Air Freight (Express) | Worldwide Major Countries | 3–7 working days | Door-to-door, suitable for small spare parts |