The S11-M 800kVA three-phase fully sealed oil immersed distribution transformer is a mainstream medium-capacity power step-down transformer widely used in global power grid, industrial plants, commercial parks and solar power stations. Rated capacity 800kVA, compatible with 10kV/11kV high voltage and 400V/415V low voltage, supporting 50Hz & 60Hz global power systems. Adopting corrugated tank hermetically sealed design without oil conservator, it realizes maintenance-free long-term running. All units comply with IEC 60076, GB/T6451 standards, with CE & ISO certification, stable performance for outdoor continuous heavy load operation.
Oil Immersed Transformers
Three Phase 800KVA Oil Type Power Transformer Factory
-
Clear shipment tracking
-
Rigorous quality inspection
-
Has good after-sales service
Detailed Description
Product Feature
1.Hermetically sealed fully welded tank, prevent moisture & oxidation, extend service life
2.Multi-protection fittings: oil level gauge, pressure relief valve, temperature indicator
3.Support OEM logo, painting color and technical parameter adjustment
4.Strict full inspection before delivery, comply with IEC, CE, ISO standards
5.Anti-corrosion exterior coating, adapt to various outdoor & indoor environments
6.Hermetically sealed fully welded tank, prevent moisture & oxidation, extend service life






Technical Specifications of 800KVA Oil Type Power Transformer
| Parameter | Standard Value/Range |
| Rated Capacity | 800kva |
| Rated Voltage Ratio | 11kV/0.4kV, 33kV/0.4kV, 10kV/0.4kV |
| Rated Frequency | 50Hz / 60Hz |
| Phase | 3 Phase |
| Vector Group | Dyn11 (Standard), Yyn0 |
| Cooling Method | ONAN (Oil Natural Air Natural) |
| Insulation Class | Class A |
| Protection Level | IP54 (Outdoor), IP20 (Indoor) |
| Short Circuit Impedance | 4% ~ 6% (Standard) |
| Insulating Oil | Mineral Transformer Oil |
| Tank Structure | Fully Sealed Corrugated Tank |
| Noise Level | ≤50dB ~ ≤65dB |
| Operating Ambient Temperature | -25°C ~ +45°C |
| Maximum Altitude | ≤1000m |
| Compliance Standard | IEC 60076, IEC 60376 |
Why Choose Yiyue
1.Professional transformer manufacturer with abundant overseas export experience
2.Products comply with IEC, CE, ISO9001 international standards to meet global market demands
3.Independent technical team provides parameter confirmation, drawing review and scheme support
4.Factory direct supply without middlemen, competitive price and reliable long-term warranty
5.Flexible customization: voltage ratio, 50Hz/60Hz, size, painting color & OEM logo
Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method Region Estimated Transit Time Remarks Sea Freight Southeast Asia 15–25 working days Port to port, FCL & LCL available Middle East 15–25 working days Port to port, FCL & LCL available North America 20–30 working days Port to port, FCL & LCL available Europe 25–35 working days Port to port, FCL & LCL available Oceania 20–30 working days Port to port, FCL & LCL available Africa 30–45 working days Port to port, FCL & LCL available Air Freight Southeast Asia 5–7 working days Airport to airport, for urgent orders Middle East 5–7 working days Airport to airport, for urgent orders North America 10–15 working days Airport to airport, for urgent orders Europe 7–15 working days Airport to airport, for urgent orders Africa 4–6 working days Airport to airport, for urgent orders Air Freight (Express) Worldwide Major Countries 3–7 working days Door-to-door, suitable for small spare parts
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Customized Packaging Solutions
- Small-sized products: Moisture-proof bubble wrap + reinforced cartons with anti-collision corner protectors
- Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
- Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
- Standard in-stock items: 5–7 working days upon payment confirmation
- Customized non-standard products: 7–15 working days after design confirmation & deposit
- Large orders with special requirements: Lead time subject to separate confirmation
| Shipping Method | Region | Estimated Transit Time | Remarks |
| Sea Freight | Southeast Asia | 15–25 working days | Port to port, FCL & LCL available |
| Middle East | 15–25 working days | Port to port, FCL & LCL available | |
| North America | 20–30 working days | Port to port, FCL & LCL available | |
| Europe | 25–35 working days | Port to port, FCL & LCL available | |
| Oceania | 20–30 working days | Port to port, FCL & LCL available | |
| Africa | 30–45 working days | Port to port, FCL & LCL available | |
| Air Freight | Southeast Asia | 5–7 working days | Airport to airport, for urgent orders |
| Middle East | 5–7 working days | Airport to airport, for urgent orders | |
| North America | 10–15 working days | Airport to airport, for urgent orders | |
| Europe | 7–15 working days | Airport to airport, for urgent orders | |
| Africa | 4–6 working days | Airport to airport, for urgent orders | |
| Air Freight (Express) | Worldwide Major Countries | 3–7 working days | Door-to-door, suitable for small spare parts |