This 160kVA three-phase hermetically sealed oil immersed distribution transformer is built to tackle tough on-site operating conditions. Designed with anti-condensation structure and reinforced anti-vibration tank, it performs steadily under fluctuating loads, high humidity or salt-spray environments. It adopts ONAN cooling and optional copper or aluminium windings, equipped with off-circuit tap changer for flexible voltage regulation. Every unit undergoes extended tests covering temperature rise, vibration and insulation check before dispatch. It fits outdoor deployment for irrigation systems, small hydropower stations and containerised substations. Yiyue can adjust dimensions, accessories and coating to match your EPC layout and local grid acceptance requirements.
1.Engineered to endure frequent load fluctuations, maintains stable output during peak and off-peak power cycles
2.Anti-condensation internal structure, cuts insulation failure risk in high-humidity and dew-prone regions
3.Reinforced tank anti-vibration construction, reducing structure-borne noise transmission to surrounding buildings
4.Pre-matched complete accessory set, saves on-site fitting work and shortens commissioning time
5.Custom tap gear layout, convenient and safe voltage adjustment without complex auxiliary tools
6.Optimised heat dissipation flow channel, keeps temperature rise stable even under prolonged partial overload
Technical Specifications of 160kVA Oil Immersed Power Transformer
Item
Specification
Rated Capacity
160 kVA
Phase Quantity
3 Phase
Rated Voltage
10kV / 0.4kV (Custom voltage ratio available)
Tap Range
±2×2.5%
Tap Changer
Off-circuit tap changer
Cooling Type
ONAN (Natural Oil Natural Air Cooling)
Connection Group
Dyn11 (Yyn0 optional)
Rated Frequency
50Hz / 60Hz Optional
Winding Material
Copper / Aluminum Optional
Core Material
Cold Rolled Grain-Oriented Silicon Steel Sheet
No-load Loss S11
270 W
Load Loss S11 @75℃
1700 W
No-load Current S11
1.1 %
Short-Circuit Impedance
4%
Noise Level
≤53 dB
Tank Structure
Hermetically sealed fully welded steel tank
Fittings
Oil level indicator, pressure relief valve, drain valve, temperature gauge
Applicable Altitude
≤1000 m (high-altitude version optional)
Ambient Temperature Range
-40℃ ~ +40℃
Execution Standard
IEC 60076, CE
Installation Location
Outdoor
Design Service Life
Up to 30 years
Why Choose Yiyue
yond transformer delivery, Yiyue builds continuous support for your power assets. We supply matching spare parts years after order completion. Our engineers offer step-by-step remote guidance for installation, tap adjustment and routine inspection. If you have repeated projects in the same region, we can lock stable pricing and shorten lead times for repeat orders.
Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
Standard in-stock items: 5–7 working days upon payment confirmation
Customized non-standard products: 7–15 working days after design confirmation & deposit
Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method
Region
Estimated Transit Time
Remarks
Sea Freight
Southeast Asia
15–25 working days
Port to port, FCL & LCL available
Middle East
15–25 working days
Port to port, FCL & LCL available
North America
20–30 working days
Port to port, FCL & LCL available
Europe
25–35 working days
Port to port, FCL & LCL available
Oceania
20–30 working days
Port to port, FCL & LCL available
Africa
30–45 working days
Port to port, FCL & LCL available
Air Freight
Southeast Asia
5–7 working days
Airport to airport, for urgent orders
Middle East
5–7 working days
Airport to airport, for urgent orders
North America
10–15 working days
Airport to airport, for urgent orders
Europe
7–15 working days
Airport to airport, for urgent orders
Africa
4–6 working days
Airport to airport, for urgent orders
Air Freight (Express)
Worldwide Major Countries
3–7 working days
Door-to-door, suitable for small spare parts
Applications
FAQs
Is the S9 transformer suitable for new projects?
The S9 series is mainly recommended for replacement projects or markets with moderate energy-efficiency requirements.
Can the transformer be customized?
Yes. We support customization for voltage, capacity, dimensions, cooling methods, and special environmental adaptations. Our engineers will work with you to finalize the specs based on your project needs.
What standards do you follow?
We design and test to IEC 60076 and GB/T standards. For specific markets, we can also produce to ANSI, BS, DIN, or AS standards. Third-party inspections are welcome.
What about the production?
Production is done in our 8,000㎡ Hefei plant. Standard lead time is 20–35 working days, with expedited options available. Factory acceptance testing is welcome before shipment.
Through tailored consulting, reliable design, and a global service network, we ensure a
wonderful, long-term, and worry-free experience for business owners.