This 125kVA three-phase oil immersed distribution transformer is designed and manufactured in accordance with IEC 60076 standard, widely adopted for AC 50Hz/60Hz power distribution systems. It adopts hermetically sealed welded tank and ONAN natural oil cooling structure, effectively isolating insulating oil from air to avoid moisture absorption and oil oxidation, realizing maintenance-free outdoor operation.
3.Strict lab testing before shipment: ratio, resistance, withstand voltage, partial discharge test
4.Products comply with IEC 60076, CE, ISO9001, fit global power grid projects
Packaging And Transportation
Yiyue Electric implements standardized packaging and shipping management to protect transformers, switchgears, cables and electrical components throughout the entire delivery process, ensuring products arrive in intact condition.
Medium & large equipment: Stretch film sealing for full moisture resistance, with foam padding on vulnerable parts for shock absorption
Heavy machinery & export shipments: ISPM15-compliant fumigated wooden cases secured with steel belts, suitable for long-distance international transit
All packages are marked with clear shipping marks and handling warnings for standard operation.
Production Lead Time
Standard in-stock items: 5–7 working days upon payment confirmation
Customized non-standard products: 7–15 working days after design confirmation & deposit
Large orders with special requirements: Lead time subject to separate confirmation
Shipping Method
Region
Estimated Transit Time
Remarks
Sea Freight
Southeast Asia
15–25 working days
Port to port, FCL & LCL available
Middle East
15–25 working days
Port to port, FCL & LCL available
North America
20–30 working days
Port to port, FCL & LCL available
Europe
25–35 working days
Port to port, FCL & LCL available
Oceania
20–30 working days
Port to port, FCL & LCL available
Africa
30–45 working days
Port to port, FCL & LCL available
Air Freight
Southeast Asia
5–7 working days
Airport to airport, for urgent orders
Middle East
5–7 working days
Airport to airport, for urgent orders
North America
10–15 working days
Airport to airport, for urgent orders
Europe
7–15 working days
Airport to airport, for urgent orders
Africa
4–6 working days
Airport to airport, for urgent orders
Air Freight (Express)
Worldwide Major Countries
3–7 working days
Door-to-door, suitable for small spare parts
Applications
FAQs
Is the S9 transformer suitable for new projects?
The S9 series is mainly recommended for replacement projects or markets with moderate energy-efficiency requirements.
Can the transformer be customized?
Yes. We support customization for voltage, capacity, dimensions, cooling methods, and special environmental adaptations. Our engineers will work with you to finalize the specs based on your project needs.
What standards do you follow?
We design and test to IEC 60076 and GB/T standards. For specific markets, we can also produce to ANSI, BS, DIN, or AS standards. Third-party inspections are welcome.
What about the production?
Production is done in our 8,000㎡ Hefei plant. Standard lead time is 20–35 working days, with expedited options available. Factory acceptance testing is welcome before shipment.
Through tailored consulting, reliable design, and a global service network, we ensure a
wonderful, long-term, and worry-free experience for business owners.